damn near done
As I said, from this point on, we finished the rest of the kitchen in less than 48 hours. I was able to fit the door casings, do the rest of the cabinets and countertops, wire the range vent hood, and lay the thresholds at the edge of the door frames.
There are a few things left to do, like replace the ugly teal ceiling fan, original to the house. IKEA was also out of stock on the large doors needed for the stove side cabinet, so we’re going without for a few weeks. On the big bare wall above the sink, we will most likely do some open shelving.
We simply snapped some iPhone photos and uploaded them to Flickr, mainly because we are burnt out. We rushed and rushed to get this whole thing done by the time L’s birthday party rolled around. Now, I don’t want to turn another screw, take another photo, wire another fixture, or even look at the resultant mess of tools and scrap wood in the garage for at least a few weeks. The ceiling fan will get to have its last hurrah.
Overall, we’re quite thrilled so far.




