You were looking for posts tagged with : "kitchen"
Here are the results.
You were looking for posts tagged with : "kitchen"
Here are the results.
As I said, from this point on, we finished the rest of the kitchen in less than 48 hours. I was able to fit the door casings, do the rest of the cabinets and countertops, wire the range vent hood, and lay the thresholds at the edge of the door frames....
Oct 28, 2009
It's been a whirlwind weekend, with my mother visiting for L's first birthday party, and finishing the entirety of the kitchen in roughly two days. I haven't been this tired or poorly rested since L was two months old....
Oct 26, 2009
Tuesday evening we pulled an almost-all-nighter to install the sink side cabinets. We booked an appointment with the plumber for Wednesday morning to hook up the sink, disposal, dishwasher, and ice maker, so we needed to have everything ready. ...
Oct 23, 2009
E and I put L to bed and spent Saturday night carrying out Operation Bunny Gray. We let it dry and saw that it was still way too dark for a kitchen that will have black cabinets. We went back to the drawing board (and Lowe's) and picked up two gallons of Iced Cube Silver....
Oct 19, 2009
Between work, life, kiddo, and Bella, progress on the kitchen has been a bit slower than we'd hoped....
Oct 16, 2009